Adaptor, Anti-Foam, Ball-Shaped

from SGD 31.06

Adaptor Synthware, Anti-Splash, Ball-Shaped, Rotary Evaporator (Rotavap)

Lead Time: 3 to 8 Weeks

Volume:
Joint Size (Upper ; Lower):

Adaptor Synthware, Anti-Splash, Ball-Shaped, Rotary Evaporator (Rotavap)

Lead Time: 3 to 8 Weeks